- WHO WE ARE
- SOLID WASTE
- Collection & Curbside Services
- 4R Star Business
- Bag-It Bags and Paper Garden Bags
- Bulky Goods Pick-Up
- Commercial and Business Recycling
- Construction & Demolition
- E-Waste (Electronic Waste)
- Food Scrap Recycling
- Holiday Tree Recycling
- Household Hazardous Waste
- Multi-Family Recycling
- Pharmaceuticals
- Plant Debris Landfill Ban
- Rates
- Recycling Guides
- Residential Recycling
- Route Maps
- Street Cans
- Used Motor Oil & Filter Recycling
- Waste Management of Alameda County
- What Do I Do With...
- Community & Education
- Reduce Waste
- Collection & Curbside Services
- WASTEWATER
- Call Us First
- Collection System Maintenance
- Dental Amalgam Program
- Easements
- Engineering
- Fats, Oils, and Grease Control Program
- How to Dispose of Fats, Oils and Grease
- Kids Games
- Lateral Replacement Grant Program
- Permits and Fees
- Projects
- References
- Sanitary Sewer Management Plan
- Standard Design Criteria
- FAQs
- CONTACT US
Engineering
Sewer Construction Update:
MASTER PLAN PRIORITY I PHASE 2 PROJECTS TO BEGIN SUMMER 2012
MASTER PLAN PRIORITY III PHASE 2 PROJECTS TO BEGIN SUMMER 2012
MASTER PLAN PRIORITY IV PHASE 1 PROJECT TO BEGIN SUMMER 2012
The District continues to implement sewer replacements and upgrades identified in the Wastewater Collection System Master Plan to reduce the risk of sewer overflows.
Please click here for a map of the repair project locations.
Wastewater Master Plan Environmental Documents:
![]() |
![]() |
|
|
Intial Study(26.8M) |
||
|
MPP2 Phase 1 Mitigated Negative Declaration (192k) |
For project information, please contact the District at (510) 537-0757.





